Describe the existing structure honestly
Note the current covering and what is known about the substrate. Unevenness, squeaks or earlier repairs are useful information, even if you do not know their cause. Photos and any existing assessment can help the contractor understand what needs checking on site.
Separate a fresh floor from other repairs
The new timber installation may need preparation or another trade’s work first. Ask how removal, substrate repairs and levelling are distinguished in the quote. If concealed conditions remain uncertain, agree a process for reviewing them once the old covering is lifted.
Plan materials and room access
Mention stairs, hallways and any limitations on delivery at the actual address. Include room dimensions and whether the home will remain occupied. Nambour project coverage, product acceptance and contractor availability are confirmed before an installation date is arranged.
Questions about nambour.
Can the subfloor be inspected before choosing boards?
An assessment may help the product conversation. Final preparation and the installation method still need to match the selected system.
Can damaged existing boards simply be covered?
That needs an assessment of the actual condition and proposed system. Describe the damage rather than assuming a new covering resolves it.
Explore the complete Timber Flooring Installation Sunshine Coast service guide, or tell us what your project needs below.

